TranESS
Global Operations
ENERGY STORAGE AT SCALE, ALREADY RUNNING
Updated:
Device overview Live
Online rate
  • Online devices
  • Offline devices
Inverter All-in-one
Energy overview Today
PV
generation
Load consumption
Battery
charge
Battery
discharge
Peak load consumption
Activated devices
Inverter
All-in-one
Online devices
Inverter
All-in-one
Offline devices
Inverter
All-in-one
Global device distribution
Devices by country Online / Offline
Global footprint Preview data
Countries
Devices online
Peak load
PV generated
Grid overview Today
Grid power purchases
kWh
Grid
Grid power sales
kWh
Peak-valley arbitrage income
The TranESS promise

Power your business, not your diesel bill.

TranESS designs, finances and maintains C&I energy storage for Nigerian conditions — from 50 kW to 125 kW and beyond.

The financial case

Three numbers decide every project.

Customers don’t buy equipment — they buy lower cost, reliable power and faster payback. This is the financial grid we design against.

Tariff
₦225+/kWh peak

Peak grid tariffs keep climbing — storage shifts your load off the most expensive hours.

Diesel cost
₦1,200–1,400/litre

Every generator hour burns cash. Hybrid control cuts diesel hours dramatically.

ROI
2–4 yrstypical payback

A correctly sized system pays for itself out of avoided diesel and grid spend — with financing to protect cash flow.

Indicative market ranges (public 2026 figures). Your free energy audit confirms the actual numbers for your site.

The process

Five steps, one accountable partner.

  1. 01

    Energy audit

    We measure load, grid quality, generator hours and tariff structure at your site.

  2. 02

    System design

    Sizing based on critical load, target backup duration and payback — not a template.

  3. 03

    Financing

    Flexible instalment plans structured around your cash flow, confirmed at audit.

  4. 04

    Delivery & install

    Certified engineering, safe integration with existing solar or generators, commissioning.

  5. 05

    After-sales

    Nationwide service network for monitoring, maintenance and support.

Hardware

Two proven platforms, engineered for uptime.

Full specifications →

50 kW C&I system + 16 kWh modular battery

Hybrid inverter with a stackable battery platform — capacity grows with your business.

50 kW hybridIP666,000 cyclesUp to 10 in parallel

125 kW / 241 kWh all-in-one cabinet

PCS + BMS + thermal + fire protection in a single cabinet. On-grid or off-grid.

IP556,000 cycles0ms switch*−30 to 60°C

*Optional 0ms seamless switching on the DYQUE platform. Full details on the product page.

Case studies

Already running in Nigerian businesses.

50 kW systems in continuous delivery, and the first 125 kW / 241 kWh cabinet sold and installed.

All projects →
Office complex

Sinari, Daranijo

≈50 kW · est. diesel-hour cut 30–50%

Media

Galaxy Radio & TV

Two installations · est. diesel-hour cut 30–50%

Residence

Ridgewell, Lekki

≈50 kW / 160 kWh · est. diesel-hour cut 30–50%

Hotel construction

AOTEL Crescent

125 kW / 241 kWh all-in-one cabinet

Factory

Ibeju Lekki factory

≈50 kW / 160 kWh · est. diesel-hour cut 30–50%

Hotel

Hotel clean-energy project

Solar-storage DC-coupled, off-grid ready

Financing

You shouldn’t have to pay for years of savings upfront.

Flexible instalment plans are structured around your cash flow, with eligibility confirmed during your energy audit.

Explore financing →

Start with a free energy audit.

We measure your load, your grid and your generator hours — then design a system that pays for itself.

Book my audit